Skip to main content
FR | NL

Search form

  • About plafometal
  • Contact us
  • Learning center

Main menu (english)

  • Our solutions
      • Products
        • Opening ceilings
        • Self-supporting ceilings
        • Open-cell ceilings
        • Linear ceilings
        • Metal tiles
        • Wall panels
      • Systems
        • Corridor ceilings
        • Wall to wall suspended ceilings
        • Linear ceilings
        • Open-cell ceilings
        • Wall panels
        • Ceiling rafts
        • Ceiling baffles
      • Bespoke
  • Our projects
  • The metal
  • Our services

You are here

  • Home
  • Discover our flagship projects
  • Swiss Life Offices

© LUC SERESIAT

© LUC SERESIAT

Offices

Swiss Life Offices

The project: 

Swiss Life called on Plafometal to renovate over 900 m² of ceilings in its sprawling open offices in Brussels. The challenge facing the project was to create a comfortable work environment offering superior safety, namely 30-minute fire stability performance in accordance with applicable fire regulations while delivering the best possible acoustic absorption.

The customer's requirements:

  • Compliance with the fire stability requirements of Belgium's NBN 713-020 fire protection standard
  • Enhanced acoustic comfort
  • Stylish solution

Our response:

Plafometal proposed a fire-resistant (FS) ceiling solution combining:

• Acoustic comfort: αw up to 1

• Fire stability in accordance with French and Belgian standards

• Easy installation

• Sleek design

In response to our customer’s specifications, we proposed the PM8 on bandraster system featuring self-supporting panels with hooks from the fire-resistant range that are designed for offices and lobbies, comprising a specific mineral wool pad in thin plastic film to ensure the best possible absorption coefficient: αw =1 («Alpha Plus» solution).

For this project, Plafometal manufactured and delivered 1,792 PM8 bandraster panels (1732 x 300 mm) with 11% Ø1.5 mm perforations and a pre-lacquered white finish.

Fire-resistant PM8 on bandraster system

  • 30-minute fire resistance to meet French and Belgian regulations.

  • Designed for framed installation on 100 mm bandrasters or hollow joint rails: ideal for offices with removable partitions.

  • Panels have hooks with abutting sides and square edges.

Product benefits :

  • Easy to disassemble by simply lifting the panel to offer complete access to the plenum 

  • Panels with hooks for greater stability

  • Greater lateral rigidity due to folded ends

 

DOWNLOAD PDF

Project’s information

  • Surface area: 931m²
  • City: Brussels
  • Country: Belgium
  • Building: Offices
  • Completion date: 2018

Contacts

  • Installation company: Decorette
  • Works supervisor: M. Decorette
  • Sales Manager:
    Plafometal
    +33 3 24 59 54 18
    contact@plafometal.fr

A question about a product? Need accompaniment with your project?

Contact us

<

A day-to-day support

At Plafometal, we support our customers on a daily basis through each step of a construction project. Following the whole project, from the building owner’s request to the delivery, we provide our customers with all advice and recommendations they may need.

Read more

Other projects

 

Municipal city of Bordeaux

 

Manhattan Tower

 

Nicolas Feuillatte wine-growing center

  • Our solutions
  • Our projects
  • The metal
  • Our services
  • About plafometal
  • Contact us
  • Learning center

Follow us on YouTube :

All our installation and product presentation videos

  • Sitemap
  • Legal notices
  • CGV
  • Vos données et vos droits